Scope of Project:
Removal of old roof and fabrication and installation of new roof, vent, hatches, and ladder.
New leg ladder, overflow pipe, interior drum railing, riser access.
Interior blast and paint with Zinc/Epoxy/Epoxy.
Exterior wash and recoat with color and logo change.