

Scope of Project:
Full blast exterior to remove all existing coatings. Apply new Zinc/Urethane/Fluoropolymer coating system.
Interior full blast. Apply new Zinc/100% Solids Epoxy coating system.
New galvanized roof railing and other steel upgrades.