Before
After

Scope of Project:  

Full blast exterior to remove all existing coatings.  Apply new Zinc/Urethane/Fluoropolymer coating system.

Interior full blast.  Apply new Zinc/100% Solids Epoxy coating system.

New galvanized roof railing and other steel upgrades.